The work of the Project shall include, without necessarily being limited to the following: Contractor shall provide all supervision, labor, furnish all materials, equipment, machinery and items necessary to and erect a new 1278 x 754 metal building around the existing slab as shown on the drawings and as specified in the specifications. All concrete work including grade beams and piers to be performed by others prior to building erection and is not part of this bid proposal