Constructing a new roadway that will include 4 to 5 lanes, an overpass of the BNSF Railroad mainline tracks, bicyclist and pedestrian facilities (widened curb lanes and curb, gutter and sidewalk), and stormwater collection and treatment. The project area includes salmonid bearing streams, wetlands, floodplains, zoned agricultural lands, geologic hazards, and possibly archaeological resources.