This project consists of, but is not limited to removal and replacement of asphalt and concrete pavement/sidewalk/curb sections; regarding of the ditch line; installation of drivable asphalt berms; installation of a new catch basin; installation of two (2) check valves; installation of horizontal and vertical joint sealant at the north stair tower of the facility; installation of one (1) corner protection angle against vehicular impact; and the installation of striping, crosswalks, sidewalk panels, sidewalk ramps, etc.