The Forest Service will be performing trail maintenance work on the Buncombe (3.5 miles) and Woods Ferry (6.5 miles) Horse Trails located on the Enoree National Forest, Union, SC 29379. Services will be between September through November 2014. A SEWCO 480 trail tractor, or similar equipment, and operator will be used to move soil, rocks, and seedlings/saplings to assist in the construction of these trails.
Kelly B Updegraff, Phone (803) 561-4093, Fax (803) 561-4010, Email [email protected] - MARK J. MILLER, CONTRACTING OFFICER, Phone 803-561-4020, Fax 803-561-4004, Email [email protected]