The scope of services includes an Evaluation and Preliminary Design of alternatives to improve the flood protection measures. The Preliminary Evaluation shall include, but is not limited to, an assessment of the numerous sources of flooding, including surface, subsurface and piped flow through and adjacent to the facility.