The work includes design, permitting and construction for the replacement of DX HVAC
equipment and controls for three buildings.
The scope of work for replacement of HVAC equipment includes calculations,
design and replacement of all equipment identified in the REPLACEMENT
EQUIPMENT TABLES. All ancillary items that are
required to provide fully operational systems are included in the scope. These
include, but are not limited to ductwork modifications and connections, drain piping
modifications and connections, gas piping modifications and connections, new
controls installation and wiring, modifications to structural equipment supports and
all equipment electrical connections.