The selected Architect-Engineer design firm will provide Supplemental Services to include the preparation of the
Predesign, Schematic Design, Design Development and Construction Documents to include, but not limited to
Geotechnical Investigation, Design Alternatives, Value Analysis, and Cost Estimating required for the Stabilize Ellis
Island Seawall (Completion of Phase I) at the Statue of Liberty National Monument in Hudson County, NJ.