The work consists of: Provide all labor, materials, and equipment to modernize UAF ELEV45 on the campus by replacing controller with micro-processor based regenerative controller, replace drive machine with AC VVVF motor, replace signaling and door opening equipment, seismic improvements, and ADA improvements.