The Project consists of a hydraulic elevator addition to Classroom East Building. The Project includes limited interior and exterior demolition, sidewalk replacement, concrete masonry structures, brick veneer cladding, storefronts, door assemblies, roofing, building finishes, and mechanical and electrical work