The complete SSPC-SP-10 cleaning and repainting of the 1,500,000 gallon elevated steel water storage tank in on the interior surfaces, and the complete SSPC-SP-6 cleaning and repainting of the exterior surfaces with full containment as outlined in SSPC Guide 6 Class 1A. Rehabilitation and replacement of specified items which includes, but is not limited to: tank appurtenances, concrete vault piping, yard piping, valves, fencing, electrical equipment, and disposal of all spoil material conforming to all applicable hazardous waste disposal requirements.