The project consists of reconstructing a total of approximately 2,495 linear feet of existing two-lan roadway. The construction consists of constructing a three-lane roadway with paved shoulders, concrete curbs and sidewalks, and drainage facilities. Davis-Bacon Prevailing Wages apply