The RFP Database
New business relationships start here

Electrical Equipment for the James Madison Memorial Building, Library of Congress (LOC), Uninterruptible Power Supply (UPS) Project.


District Of Columbia, United States
Government : Federal
RFQ
Go to the link
This document has expired, therefore the above link may no longer work.

THIS REQUIREMENT (IFBCD170008) TAKES THE PLACE OF RFQCD170008 POSTED ON FBO ON DECEMBER 28, 2016.

Project Overview: The Architect of the Capitol has a requirement to provide a reliable, uninterruptible power supply for the James Madison Memorial Building, Library of Congress in Washington, D.C.

Period of Performance: Base Bid: the period of performance of the resultant contract shall not exceed 398 calendar days from award, this includes the timeframe for Government installation of all UPS equipment and all on-site manufacturer compliant commissioning requirements, equipment and systems tests, and user training. 

Bid Option #1: if exercised at time of award of bid base, its period of performance is included in the performance period of the bid base.


Questions regarding this solicitation are due in writing to the Contracting Officer, via email at msherman@aoc.gov, no later than 5:00pm ET on January 18, 2017. Questions received after this time may not be answered.

Notice: it's the sole responsibility of bidders to monitor the FBO Website for any amendments issued to this solicitation.


Marlene M Sherman, Contracting Officer, Phone (202) 226-1934, Email msherman@aoc.gov

    1. Home
    2. Articles
    3. Login or Register

    4. Search

    5. Add/Announce your RFP