The City is accepting sealed statements of qualifications from qualified engineering firms and individuals for the design and preparation of a complete set of construction plans and special provisions. The project constructs a new off-ramp from northbound. The new off-ramp will follow the alignment and connect to the Boulevard at a proposed roundabout. The additional ramp will reduce the current Exit off-ramp volume and improve traffic flow and safety between the off-ramp and Road.