Composite concrete and wood blocks prefabricated of various heights. Used for dry docking vessels. The blocks are arranged in the dry dock to support various ship's keels. See attached drawings. Anticipate an IDIQ contract with a one year option. Two year anticipated need is as follows:
30" : 32 to 38 blocks
54" : 29 to 51 blocks
90" : 63 to 63 blocks
Please email Mark Bultman mark.bultman at navy.mil if potentially interested on bidding for a direct copy of the solicitation, anticipated mid July 2014.
Benjamin Peralta 808.753.9326 Benjamin is technical POC. Secondary Technical POC: Tyler Furukawa, 808.473.8000 x5220. Contracting POC: Mark Bultman x5822.
Contracting Officer Email