The project is funded through a Clean/Drinking Water Loan Fund. The work includes, but is not limited to, the following:
8,200 LF of 12" HDPE water main; 2,500 LF of 8" DI gravity sewer main; and 6,000 LF of HDPE pressure sewer main; a pressure reducing valve vault; a sewer lift station; 19 fire hydrants; 87 water and sewer services; and other associated appurtenances and related improvements.