Mandatory pre-bid meeting 12/01/2009.
Project consists of the construction of approximately 4,000 LF of four lanes divided concrete boulevard section with a raised median to replace existing two lanes roadway. The proposed pavement structures consist of 10-inch concrete underlain by 8-inch lime-flyash stabilized subgrade. The proposed construction also includes the storm sewer systems.