The Drive Mill and Overlay Project consists of approximately 1800 feet of street restoration involving milling and removing existing asphalt pavement and installing a new asphalt surface within the limits shown on the plans. The work also includes mobilization, barricades and signs, SWPPP, hauling salvageable asphaltic material, repair of existing base material, application of prime and tack coat and other miscellaneous items necessary to complete the project.