This project creates a new road connection. The project extends the Drive from its existing dead-end to the intersection, along the alignment of the existing driveway into the development. A new three-way, stop-controlled intersection will be constructed. The project also provides for a sidewalk along the south side of the new road. CDBG stimulus funds will be used to complete the project.