Drive Bridge Replacement involves realigning Drive to a new intersection with Boulevard, south over an existing stone masonry culvert crossing at Creek. The nearby historic Bridge may be preserved as a pedestrian bridge crossing to enhance trail access or closed. This prequalification is for Phase 2 work only.
RANGE: 2,000,000 to $4,000,000