Nevada, south of State Route 164. Work consists of drilling one production well using the dual wall reverse circulation rotary method to an anticipated depth of 1,200 feet below land surface. The well will be completed with 14 inch HSLA blank casing and louvered stainless steel screen. Development consists of dual-swab airlifting and pump development. Production testing will consist of both step tests and a 72-hour continuous pump test. Following borehole drilling and geophysical logging, the Engineer will determine whether or not to proceed with well construction, or to abandon the borehole.