Prepare a Drainage Management Plan for the basins identified in the scope of work that will identify drainage options for the future drainage systems in currently undeveloped areas that will also protect downstream developed property and optimize existing drainage systems.
2. Prepare a PMP analysis of Mesa Del Sol to determine possible flows in to the project area.
3. Evaluate possible structural and non structural items that would minimize gross pollutants into the Rio Grande.