Construction of approximately 2,250 LF of sidewalk This project also includes the bank stabilization with gabion walls and gabion mattress. The sidewalk improvements include a pedestrian bridge bridge, construction of a culvert at the existing drainage ditch north of Schrade to allow for the new sidewalk, retaining walls and handrails at locations shown on the plans. Additional drainage improvements include the construction of a drop inlet and storm sewer as shown in the plans.