Pre-submittal conference 03/12/2010.
The Construction Manager at Risk will begin in a support role for design phase services and will hold the construction contract with the City for construction of the project. At some point prior to construction, the CMAR will assume the risk of delivering the project through a Guaranteed Maximum Price (GMP) contract. The CMAR will be responsible for construction means and methods, and will be required to solicit bids from pre-qualified subcontractors to perform the work using the Citys subcontractor selection process. For this project, the CMAR is responsible for self-performing a minimum of 45% of the construction work as measured by total contract price for construction.