The work consists of raising the vertical profile for the installation of a new 7 barrel 10' x 6' reinforced concrete box culvert. Additional work includes construction and removal of a temporary detour roadway, removal of existing pipes, replacing pavement markings, rumble-strip grinding, and other miscellaneous work.