It will include the excavation of three ponds; and the installation of the associated storm sewer pipes, control structures, manholes, inlets, and various drainage structures (such as M.E.S. and headwalls). A portion of the project will involve the removal of existing pavement and stabilization on roadways for the installation of the storm sewer; and then the placement of asphalt, concrete driveways and shell to stabilize the areas disturbed during the work in the roadways. It will also include the installation of wetland plants. All disturbed areas will need to be stabilized with sod.