The drainage work consists of grading and excavating ditches and channels as well as plating some channel sections with shotcrete. The safety work includes minor pavement widening and installation of guardrail and its associated end treatments. The work also includes installing reinforced concrete box culverts; pipe culverts; riprap; removal and replacement of signing; and other related work.