This document has expired, therefore the above link may no longer work.
for supplying, furnishing and paying for all labor, materials, tools, transportation and equipment necessary to construct in place complete, all work as called for in the drawings and specifications for the RACEWAY PARK DRAG STRIP RESURFACING,