The major items of work include the construction of sidewalk, concrete trail and streetscaping features which will include grading, pavement reconstruction, a pedestrian bridge, retaining walls, drainage structures, traffic signal relocations, illumination, signing, pavement markings, and erosion control. Length of this portion of the project is approximately 1.63 miles.