Furnish & install all labor, equipment material & incidentals required to complete the work to include: (1) Demolition & proper disposal of existing aluminum frame windows, (2) abatement of existing window caulk & glazing which contain asbestos & shall be abated by contractor licensed by Georgia EPD; and (3) Installation of new vinyl windows (Type A & B).