The RFP Database
New business relationships start here

Doors & Hardware


Washington, United States
Government : State
RFP
Go to the link
This document has expired, therefore the above link may no longer work.

Subcontractor shall furnish, deliver, and install all hollow metal doors and hardware per the Construction Drawings and Specifications. b) Subcontractor shall off-load and transport hollow metal door frames to a stocking location or room on each floor of the new building. Repair or replace at BP.08.02 Subcontractor’s expense door frames not supplied per the final approved submittal. Provide manufacturers’ warranties as indicated in the Specifications. d) All anchoring hardware for hollow metal door frames shall be furnished by BP.08.02, including but not limited to, mounting hardware in CMU or concrete walls, fasteners, anchor clips, shims, backing, sealants, backer rod, grouting for floor closers, etc. e) All hollow metal doors and hardware are to be marked and tagged with door/room numbers per contract documents prior to delivery. f) Provide UL fire resistant labels on doors and frames as scheduled and specified. Labels shall be visible after installation.

    1. Home
    2. Articles
    3. Login or Register

    4. Search

    5. Add/Announce your RFP