The RFP Database
New business relationships start here

Dismantling and taking over belt conveyor system at Ranjit Sagar Dam Project


India
For Profit
RFP
Download the rfp file: RanjitSagarDamTender.pdf.

Description of work Period Approx. Cost Earnest Money
in lacs in lacs


Dismantling and taking over so dismantled material of approximate 6.4 KM belt conveyor System 2500 TPH capacity, Centrally operated, Fully automatic, including Truck Dump Hopper at Salary Khad and unloading stations at Stockpile area near Power House -Down Stream of Main Dam on- As is where is basis- at Ranjit Sagar Dam Project as per detail given below:-
1MECHANICAL INSTALATIONS
Idler Rolls and Frames, Gates and allied items 03 month 46.00 1.00
2. STRUCTURE STEEL
Structural steel -built-up structure-, made up of MS Channel, Angles, Flats, RSJ, Plates etc. -Except CGI Sheets of TP houses, Sub stations etc.
08 month 325.00 6.50

For further Detail, Please contact :
Executive Engineer,
RSD-Communication Division,
Shahpurkandi Township. 96460 63363,

    1. Home
    2. Articles
    3. Login or Register

    4. Search

    5. Add/Announce your RFP