This project consists of installation of digester gas scrubbing equipment and piping at the Primary Wastewater Treatment Plant to scrub digester gas to allow for use of the gas to operate boilers providing process heat in lieu of use of natural gas. The proposed equipment is to be installed on a pad in an area that is currently paved and is a part of the developed area at the plant.