Proposals submitted will be for a complete turn-key construction and installation for the Addition of Design-Build Modular Classrooms, complete from design through fabrication, site assembly/installation and all services required to complete and deliver for occupancy the complete facility to include the work required to provide all space as required by the spatial needs requirements as described in the RFP, together with all necessary modifications to the existing structure for modular classrooms consisting of all new materials, new foundations and site work.
The entire facility and classrooms must be ready for use and occupancy no later than August 26, 2011. Estimated cost of construction: $600,000.