This 7.5 Mile project will serve service the northwest section of the sewer ETJ while also eliminating two lift stations, then conveying sewer flows to the North Wastewater Treatment Plant (NWWTP). This trunk sewer will connect to future 60 MGD lift station as part of the NWWTP expansion (currently under design).