The RFP Database
New business relationships start here

Design Build of Readiness Center


Pennsylvania, United States
Government : County
RFP
Go to the link
This document has expired, therefore the above link may no longer work.

The facility will be built on approximately 3.22 acres of a 12 acre property. The primary facility will include administrative, classroom, storage, an arms vault, male/female latrines, assembly hall, and kitchen space with flammable and controlled waste storage areas. The facility will be one story permanent construction with CMU veneer/concrete block and concrete floors with durable roof designed by the professional. Cost effective energy conserving features will be incorporated into design, including energy management control systems and high efficiency motors, lighting, and HVAC systems.

    1. Home
    2. Articles
    3. Login or Register

    4. Search

    5. Add/Announce your RFP