The contract for design/build services will consist of two parts. Part one services include design, construction administration, value engineering, constructability analyses, development of a cost model, estimating, and the development of a Guaranteed Maximum Price (GMP) proposal may be based on 60% Construction Documents pending the strength and experience of the D/B team, for which the design/builder will be paid a fixed fee.
If the GMP is accepted, part two, the construction phase, will be implemented. In part two of the contract, the design/builder becomes the single point of responsibility for completion of the construction documents, performance of the construction of the project and shall publicly bid trade contracts.