The RFP Database
New business relationships start here

Design/ Build Above Ground Storage Fuel Tank System

  1. This RFQ had a pre-bid event.


Missouri, United States
Government : Municipal
RFQ
Go to the link
This document has expired, therefore the above link may no longer work.

CONTRACTOR shall design, furnish, and install a fully operational aboveground storage tank (AST) system as a "Turn Key" project at the City - Transit Services' facilit. The AST system will be used for transit vehicle and automobile fueling and shall generally be comprised of a 10,000 gallon gasoline AST, 10,000 gallon diesel AST, fuel island, dispensers, monitoring equipment, overfill protection, spill containment, and all ancillary components.CONTRACTOR shall provide all materials, equipment, transportation, labor, superintendence, placards, design, engineering, permitting fees, materials testing fees, waste characterization, disposal / recycling, and other services / items necessary to complete the project in a timely manner; and must operate in accordance with the best practices of the profession.

    1. Home
    2. Articles
    3. Login or Register

    4. Search

    5. Add/Announce your RFP