The Project consists of demolition of existing structures and construction of new equipment shelters and shop building including associated site work. The superstructure of these buildings is to be pre-framed-panel, pre-engineered steel building panels, shop-constructed in modules which can be disassembled without removal of exterior metal cladding or roof panels.