This space will require the demo and removal including but not limited, to existing flooring, base, walls, ceilings, ductwork, plumbing piping, lights, doors, door frames, plumbing fixtures, shelving, cabinetry, fire extinguishers, all wall mounted equipment and brackets, fire sprinklers, fire alarm devices, HVAC equipment, electrical equipment, coordination of demo for asbestos containing materials, sanitary piping, electrical receptacles, lighting, switches, smoke detectors, all A/V devices and equipment, security devices and equipment, electrical panels, disconnects, electrical transformers, J-boxes, electrical conduit, all wiring, all switches, and telephone as shown on the drawings. The space will require new construction of walls, ceilings, MEP systems, flooring, millwork, floors, and ceilings, painting, testing, commissioning, coordination of equipment requirements with vendors, new accessories, fire alarm, controls, new telecom room with rack and wire managers as shown on drawings. Also include fireproofing at exterior window walls at between floor openings at convector units. (not shown on drawings)