Non-mandatory pre-bid meeting 02/16/2010.
Pre-qualification required.
Minor site demolition work in construction of a new 64,470 sq ft steel framed high school building. One area of the building houses an aqua cultural center. The other area of the building has ground level covered parking, 2 floors of classrooms, administration and support spaces.