Mandatory pre-bid meeting 05/11/2010.
This project involves the replacement of existing cat-5 and cat-3 cabling,connections and terminations with a new Cat-6 cabling system complete in a 3 story academic building on the main campus. Project will include demolition and removal of old cables, installation of new cables,terminations, and testing.