This project consists of the planning and design of the Road to improve safety and operations and reduce congestion by increasing mainline capacity, as well as improving the Intersection. Specifically, the project will determine a location and design for construction of a roadway and ancillary structures to facilitate the orderly movement of the140,000 vehicles per day. The project will widen the Road from four lanes to six lanes and provide all other necessary connections to ensure full functionality with the ultimate configuration.