The Contractor shall provide traffic design services in support of the design and construction of Highway Safety Improvement Program (HSIP) projects and highway design projects. Services shall include design surveying, public involvement, Design Study Report, Utility Conflict Report, preparation of plans, specifications and estimates, bidding assistance and construction assistance. Preparation of Environmental Documents and Utility Agreement preparation may be included. Projects to be accomplished under this agreement are listed in the Proposed Statement of Services, Article B6.1, page 4.
A complete description of services is contained in the RFP Package. Estimated period for performance of the Agreement is approximately April 2008 to November 2009. Cost of these professional services is expected to be in the range of $1,000,000 or greater.