The project consists of sewer and water system improvements including but not limited to approximately 640 feet of 8-foot by 4-foot box culvert; 315 feet of 60-inch gravity sewer; 280 feet of 42-inch gravity sewer; 220 feet of 36-inch gravity sewer; 250 feet of 30-inch gravity sewer; 25 feet of 24-inch gravity sewer; 25 feet of 18-inch gravity sewer; 45 feet of 15-inch gravity sewer; 80 feet of 16-inch gravity sewer; 125 feet of 10-inch gravity sewer; 75 feet of 8-inch gravity sewer; 60 feet of 6-inch water main; 440 feet of 18-inch Cured in Place Pipe lining; 400 feet of 38-inch by 47-inch Cured in Place Pipe lining; 55 feet of 43- inch by 54-inch Cured in Place Pipe ling; 390 feet of 54-inch Cured in Place Pipe lining; road reconstruction; erosion and sedimentation control; and all associated restoration connections and appurtenant work. The