This document has expired, therefore the above link may no longer work.
This project consists of removing and replacing approximately 8,000 square feet of 4" and 6" sidewalk, 4,000 square feet of new 4", 6", and 8" sidewalk/driveway with 150 lineal feet of curb, asphalt repair and associated work.