Work consists of removal a a failed and undersized metal culvert and headwalls (inlet & outlet), trench backfill, installation of drainage structures, stream channel stabilization, water service line installation, water main abandonment, road restoration, and miscellaneous work and cleanup. Project includes erosion and silt control within and adjacent to the stream channel, and all associated construction zone traffic control.