The Contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform diagnostics and repair of an overhead 2-1/2 ton R&M hoist used in aircraft engine repair. Contractor shall remove, replace, and dispose of damaged parts, and perform load test services . It is suspected the load brake assembly requires replacement.
There is a required site visit for this solicititaion. It is scheduled for Tuesday July 17,2018 at 1000 am.
Please respond to Dawn Graham @ dawn.graham.3@us.af.mil by Monday, July 9, 2018 0900 with the names of people who will be attending the visit.
Dawn Graham, Contract Specialist, Phone 208-828-3104, Email dawn.graham.3@us.af.mil