The project includes separating existing fire sprinkler and domestic water service, adding hydrants, and site work. The upgraded water system will cross under County owned subsurface infrastructure systems and surface systems.
The Contractor is required to have experience working in an urban right of way, campus setting, and/or a correctional facility. The project manager and/or site superintendent must have performed this type of work at this budget level; worked with or around medium voltage underground electrical systems (12kV), and be experienced in minimizing building operation risks during project