Specific work includes removal of all rail, ties and other track material (OTM) within the Cross
Corridor right-of-waywith the exception of at-grade roadway crossings. Items of work include removal and salvage of the railway; removal and salvage/disposal of OTM; restoration of all disturbed areas to match preconstruction or better conditions; and providing, installing, and maintaining TESC BMPs to protect sensitive areas.