The scope of this project is to furnish the complete design, supply, installation and
commissioning of an In‐Row DX Air Cooled System for the Information Technology room. The Subcontractor(s) shall design the system, furnish and
install all of the required materials, equipment, all interconnection exhaust and supply
piping and electrical wiring, perform all related site work and provide all labor, tools and
supervision necessary for a complete and fully functioning IT Room Air Conditioning
System.